POSITIVE 2023

Reversibility four-test battery

Objective
Determine whether a deployed system can be withdrawn by its operators.
Method
Four engineering tests prior to any external existence (SEN-23-041).
Failure
Four programmes that worked were still rejected.
Conclusion
Working is not sufficient. Withdrawal path is.
Result
POSITIVE

Inspect in discovery graph →