ASHEN INACTIVE CONTROLLED commissioned 1991

Station status: INACTIVE

Observatory ASHEN

Optical and radio quiet-hours survey support.

Directorate
Directorate III
Status
INACTIVE
Commissioned
1991
Last routine report
2011
Location
Subarctic plateau — seasonal access only.
Operational history
Winterised and left in holdover after budget reallocation. Instruments remain on a reduced Argus watch. Several logbooks from 1997–1999 were transferred to MERIDIAN with pages missing; the gaps are indexed.

Timeline

  • 1991 Institution renamed SENTINEL
  • 2024 Convergent independent results

Inspect in discovery graph →