Nineteen Hours at ARGENT
Post-incident assembly of the loss-of-reference event. Closed with procedural changes; not closed with comfort.
Uncertainty is part of the file. Fictional institutional record — not a real-world claim.
- Lead
- Directorate I
- Status
- CLOSED
- Opened
- 1993-02-09
- Last reviewed
- 1994-11-02
Known
- External reference was lost for approximately nineteen hours.
- Local oscillators continued; disagreement was not treated as an instrument state.
- Procedural changes followed (SEN-93-112).
Unknown
- Whether any observations from the window remain mis-timestamped in secondary copies.
Open questions
- Do any secondary copies still carry timestamps from the unverified window?
Competing explanations
- Single failed oscillator — rejected as incomplete.
- Organisational confidence in an unverified reference — retained as the teaching finding.
Evidence
Counter-evidence / limits
- No public evidence that a single failed oscillator alone caused the nineteen-hour window.
Timeline
-
1993-02-08
Incident window
SEN-93-112 -
1993-02-09
Case opened
-
1994-11-02
Closure: timing treated as instrumented state
SEN-93-112
Disclosure history
- 1993-02-09 — Case opened INTERNAL; later summarised OPEN
- 1994-11-02 — Closed; teaching note retained in SEN-93-112
Current status / finding
Closed. Root cause was organisational confidence in an unverified reference, not a single failed oscillator.
Institutional fiction. Uncertainty is retained on purpose — do not read a finding as a real-world claim.
Timeline consistency — ARGENT loss of reference
Four dated notes about the 1993 ARGENT incident were indexed without order. One ordering makes the procedural finding legible.
Objective Enter the event codes in chronological order, comma-separated (e.g. W,X,Y,Z).
Clues
- W — 1994-11-02 — Closure: timing treated as instrumented state (SEN-93-112)
- X — 1993-02-08 — Incident window
- Y — 1993-02-09 — Case opened
- Z — 2016-03-22 — Experiment Delta holdover results filed (later teaching use)
Hint
The incident precedes the case opening by one day.
Second hint
Closure is 1994; Delta is a later related experiment, not part of the incident week.
Accessible path (no interaction required)
Chronological order: X (1993-02-08), Y (1993-02-09), W (1994-11-02), Z (2016).
Motion: none required. Status updates are text-only. Prefer the accessible path above if you use reduced motion or keyboard-only navigation.